RIght of Way Use/Closure (2024)

  • Event Planning Guide Overview
  • Special Event Permitting Process
  • Special Event Application
  • ADA Compliance
  • Alcohol
  • Drone Displays
  • Emissions Management Plan
  • Event Planning Fees
  • Fire Safety
  • Food Service
  • Insurance
  • Lighting Installations
  • Medical Staffing
  • Mobility Options
  • Special Event Notifications
  • Non-Discrimination
  • Outdoor Amplified Sound
  • Park Use
  • Parking
  • Public Health and Sanitation
  • Signage/Projections/Banners
  • Special Events Site Plans
  • RIght of Way Use/Closure
  • Temporary Change of Use
  • Tents
  • Vendors
  • Waterways
  • Water Services

Right of Way (ROW) is public-owned land and includes sidewalks, streets, alleys, and parking lanes. You must obtain a permit to use or close any portion of the ROW. Permits for using or closing the ROW associated with Events are issued by the Transportation and Public Works Department’s (TPW) Office of Special Events (OSE). They can only be obtained after submitting an ACE/Special Event Application. Use of the ROW must be noted on the ACE/Special Event application for TPW OSE to review your request.

Example Uses

Visit the TPW Office of Special Events webpagefor a complete Street Event Permitting Types and Requirements Guide.

RIght of Way Use/Closure (1)

Event Requirements

The following requirements are associated with Right of Way permits only and do not include requirements or fees from other departments (APD, AFD, EMS, PARD etc.).

Tier 1

All requirements are due no later than three (3) business days before the first day of the event. An application cannot be turned in three business days out and other requirements turned in one or two days later. An exception will be made for permit fee payments.

All items due 3 business days before the event:

  • Sign-off from affected businesses/residents - form will be provided
  • Approved Traffic Control Plan – if applicable
  • Barricade Company Letter/Quote/Invoice – if applicable
  • Certificate of Insurance (PDF) RIght of Way Use/Closure (2)
  • Payment of all Right of Way permit fees
Tier 2

All requirements are due no later than thirty (30) business days before the first day of the event. An application cannot be turned in thirty (30) business days out, and other requirements turned in one or two days later. An exception will be made for permit fee payments.

Attendance at an ACE Meeting may be required.

Due 30 calendar days before the first event day:

  • Coordination with CapMetro
  • Coordination with theTexas State Preservation Board &Texas Facilities Commission – if applicable
  • Street closure document (PDF) RIght of Way Use/Closure (3)
  • Sign-off from affected businesses/residents - form will be provided
  • Preliminary Traffic Control Plan – Approved plan is due 10 calendar days prior
  • Barricade Company Letter/Quote/Invoice
  • Certificate of Insurance (PDF) RIght of Way Use/Closure (4)
  • Toilet/Trash arrangements – if being placed on ROW
  • Copies of TABC permits – if applicable
  • Payment of all Right of Way permit fees
Tier 3

Application and preliminary requirements are due 120 calendar days before the first day of the event. Additional requirements will be due 60 days, 30 days, 14 days, and 10 days before the first day of the event.

Due 120 calendar days before the first event day:

  • Coordination with CapMetro
  • Coordination with the Texas State Preservation Board & Texas Facilities Commission – if applicable
  • Street closure document (PDF) RIght of Way Use/Closure (5)
  • Payment of Right of Way Permit Application Fee
  • Events held 4 years or less: Draft notification mailer approved by TPW OSE Staff and mailed
    • SeeNeighborhood Notificationfor more information.

Due 60 calendar days before the first event day:

  • Attend an Austin Center for Events(ACE) Meeting – City will schedule, may be earlier
  • Preliminary Traffic Control Plan
  • Barricade Company Letter of Intent

Due 30 calendar days before the first event day:

  • Certificate of Insurance (PDF) RIght of Way Use/Closure (6)
  • Final Site Plan and/or Route Map
    • SeeSpecial Event Site Plansfor more information.
  • Route Sign Draft submitted and approved by TPW OSE Staff – if applicable
  • Toilet/Trash arrangements – if being placed on ROW
  • Copies of TABC permits – if applicable
  • Events held 5 years or more: Draft notification mailer approved by TPW OSE Staff and mailed
    • SeeNeighborhood Notificationfor more information.

Due 14 calendar days before the first event day:

  • Approved Traffic Control Plan
  • Emergency Safety Plan - Developed in coordination with APD/AFD/EMS.
  • Payment of all Right of Way permit fees

Due 10 calendar days before the event:

  • Route signs placed
Tier 4

Application and preliminary requirements are due 180 calendar days before the first day of the event.Additional requirements will be due 60 days, 30 days, 14 days, and 10 days before the first day of the event.

Due 180 calendar days before the first event day:

  • Coordination with CapMetro
  • Coordination with the Texas State Preservation Board & Texas Facilities Commission – if applicable
  • Street closure document (PDF) RIght of Way Use/Closure (7)
  • Payment of Right of Way Permit Application Fee
  • Events held 4 years or less: Draft notification mailer approved by TPW OSE Staff and mailed
    • SeeNeighborhood Notificationfor more information.

Due 60 calendar days before the first event day:

  • Attend an Austin Center for EventsMeeting – City will schedule, may be earlier
  • Preliminary Traffic Control Plan
  • Barricade Company Letter of Intent

Due 30 calendar days before the first event day:

  • Certificate of Insurance (PDF) RIght of Way Use/Closure (8)
  • Final Site Plan and/or Route Map
    • SeeSpecial Event Site Plansfor more information.
  • Route Sign Draft submitted and approved by TPW OSE Staff – if applicable
  • Toilet/Trash arrangements – if being placed on ROW
  • Copies of TABC permits – if applicable
  • Events held 5 years or more: Draft notification mailer approved by TPW OSE Staff and mailed
    • SeeNeighborhood Notificationfor more information.

Due 14 calendar days before the first event day:

  • Approved Traffic Control Plan
  • Emergency Safety Plan - Developed in coordination with APD/AFD/EMS.
  • Payment of all Right of Way permit fees

Due 10 calendar days before the event:

  • Route signs placed

Traffic Control Plan (TCP)

A TCP describes temporary traffic control measures and devices used to facilitate vehicular and pedestrian traffic around a temporarily closed area, such as a construction zone or special event. TCP’s are required to be signed and sealed by a Professional Engineer (PE) Certified in Texas, and the final engineer-sealed TCP must be reviewed and approved by the City of Austin Transportation and Public Works Department (TPW). TCP’s are not considered received until they are submitted through the TPW Right of Way Portal.

  • Example Traffic Control Plan(PDF) RIght of Way Use/Closure (9)

For more information, please emailTransportationSpecialEvents@austintexas.govor call 512-974-6501.

  • Event Planning Guide Overview
  • Special Event Permitting Process
  • Special Event Application
  • ADA Compliance
  • Alcohol
  • Drone Displays
  • Emissions Management Plan
  • Event Planning Fees
  • Fire Safety
  • Food Service
  • Insurance
  • Lighting Installations
  • Medical Staffing
  • Mobility Options
  • Special Event Notifications
  • Non-Discrimination
  • Outdoor Amplified Sound
  • Park Use
  • Parking
  • Public Health and Sanitation
  • Signage/Projections/Banners
  • Special Events Site Plans
  • RIght of Way Use/Closure
  • Temporary Change of Use
  • Tents
  • Vendors
  • Waterways
  • Water Services
RIght of Way Use/Closure (2024)
Top Articles
Latest Posts
Article information

Author: Fredrick Kertzmann

Last Updated:

Views: 5981

Rating: 4.6 / 5 (66 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Fredrick Kertzmann

Birthday: 2000-04-29

Address: Apt. 203 613 Huels Gateway, Ralphtown, LA 40204

Phone: +2135150832870

Job: Regional Design Producer

Hobby: Nordic skating, Lacemaking, Mountain biking, Rowing, Gardening, Water sports, role-playing games

Introduction: My name is Fredrick Kertzmann, I am a gleaming, encouraging, inexpensive, thankful, tender, quaint, precious person who loves writing and wants to share my knowledge and understanding with you.